Projects

Technician installing solar panels on a rooftop for sustainable energy solutions.

SOLAR FIELD MAINTENANCE, RWANDA

Solar Field Maintenance Service, Agahozo Shalom Youth Village (ASYV) Rwanda. The solar field generates enough electricity to contribute to a roughly 10 percent increase in Rwanda’s electricity supply.
A red communication tower with antennas stands tall against a gray sky.

TELECOMS SUPPORT PROJECTS

PPS has engineered multiple projects for telecommunication companies, such as Grande Communications, Spectrum, CenturyLink, so they could extend their fiber optic network to serve new customers. The projects require PPS to perform the necessary field work to determine the make ready recommendations for the telecoms to attach their fiber to utility poles. From this data, PPS prepares Pole Attachment Applications for the respective pole owners.
Detailed view of high voltage electrical substation with transformers and power lines.

ELECTRICITY ACCESS PROJECT, UGANDA

Rural Electricity Access Project. The project was part of the Government of Uganda ten year rural electrification program (RESP-2) to expand access to electricity. The project expanded the grid medium voltage (MV) and low voltage (LV) distribution networks spread over five service territories (ST) in 16 district areas and provide last-mile connections to households, public infrastructure and small and medium enterprises.
Hand of electrician working on a circuit breaker panel with colorful wires, ensuring safe electrical connections.

COMPARATIVE LOAD PROJECT

Hondo Electric Cooperative Load Study. PPS performed two separate studies for the analysis of residential loading. One Study identifies an accurate methodology to calculate load when all of the necessary load information is available regarding appliance sizes for a residential unit.

AVR MAINTENANCE

Automatic Voltage Regulators Maintenance Service, American Embassy Abuja
Close-up of electrical transformers with colorful tops and wires in an outdoor setting.

SUBSTATION UPGRADE

Hondo Substation Upgrade. PPS completed engineering planning to upgrade the Electric Substation in Hondo in order to allow the substation to operate at optimum capacity. The upgrade consisted of reconductoring all existing circuits from the substation to the distribution riser poles.
An industrial power plant with heavy machinery and equipment behind a chain link fence during sunset, showcasing energy infrastructure.

AIR HANDLING UNITS MAINTENANCE

5 Year Air Handling Units Maint. & Repair Service Contract, American Embassy Brazzaville, Congo

HIGH VOLTAGE TRANSFORMER MAINT.

5 Year Transformer Maintenance Service Contract, American Embassy Niamey, Niger
High-tech robots assembling a car in a modern factory setting, showcasing automation.

BUILDING AUTOMATION SYSTEMS

Building Automation Installation & Maintenance Service, Carnegie Mellon University Africa, Rwanda

How can we help you?

Contact us  info@pacificplacellc.com

to you or submit a business inquiry online.

– Design-Build & Upgrade of Photovoltaic System, American Embassy Bujumbura, Burundi

– Maintenance Photovoltaic System, American Embassy Koror, Palau

– Repair and maintenance of Photovoltaic System, American Embassy Djibouti, Djibouti

– Repair and Maintenance of Photovoltaic System, American Embassy Ouagadougou, Burkina Faso

– Upgrade of Electrical Distribution System, American Embassy Antananarivo, Madagascar

– Maintenance CMD Electrical Distribution System, American Embassy Conakry, Guinea

– Maintenance and Repair of Medium Voltage Transformer and AVR, American Embassy Niamey, Niger

– Repair and Upgrade of Main Incomer Breaker, American Embassy Abuja, Nigeria

– Maintenance of Automatic Voltage Regulators, American Embassy Abuja, Nigeria

– Maintenance & Repair of Air Handling Units, American Embassy Brazzaville, Congo

– Maintenance of York Chiller Systems, American Embassy Maputo, Mozambique